PEACE WWTP CONSTRUCTION (slide show)

Construct 260,000 gallon cast in place anaerobic tank and adjoining 260,000 gallon aerobic tank.

Modify original system tank to feed new system.

Restore original concrete tank system and install chemical resistant lining system.

Install discharge pumps and piping from original system to new tanks.

Process Water System Rehab

Install new roof canopy over entire process water system

Modify tank support structure to uncover sludge press for added work clearance

Install new stair well in place of safety ladder

Install new concrete curbing for containment

Rehab interior of clarifier, resurfacing concrete and install floor lining

New Process Facility

Infrastructure

Process containment

Facilities construction

Equipment placement

REPAIR CONTAINMENT BASIN

Remove damaged concrete from containment basin

Decontaminate soil and stabilize sub grade

Install new concrete floor and drain sump

Re-grout damaged walls and install cove

Install vinyl-ester lining system with fiberglass saturate

WATER SYSTEM CLARIFIER REPAIR

Replace drive units and repair rotating structures

Re-grout damaged areas of tank surface

Blast and coat all steel structures including bridge and hand rail

Rehab Basement Ceiling 4000sf

Remove spalling and cracking concrete

Sandblast and coat exposed rebar

Install new reinforcing

Gunnite resurface all ceiling areas

Rehab Supply Aqueduct

Sanitize flume to remove all mold and mildew

Sandblast all substrate below water line

Gunnite all surfaces below water line

Install polyurethane coating system over resurfacing

Construct new containment

Remove fill and grade site

Construct new tank containment and truck unload area

Install vinyl ester lining system

Construct Roof Canopies for Chemical Area

Fabricate steel structure for framing system

Blast and coat all primary steel

Erect steel and install roof and skirt walls

Relocate sludge press

Create opening above mezzanine in building

Remove sludge press form 2nd floor

Fabricate and install new stands and man way

Install press at new location

Restore piping and electrical

Storage tank cleaning and painting

Mill cleaning, painting and maintenance
                                                          
Structural steel repairs and new structure installation

Process floor reconstruction and performance coating application

Performance tank linings

Repair pre-filtered holding tank

Repair spalling and cracking concrete on tank exterior with vertical repair grout

Remove all damaged and honeycomb areas from interior walls

Fill voids in interior walls with urethane filler

Apply 125 Mils of Sherflex Polyurethane lining system to seal tank

Rebuild Waste Water Clarifier

Disassemble drums, rake arms and drives

Fabricate new inner and outer drums

Reinforce rake arms and replace damaged material

Repair intake/discharge pipe

Sandblast and coat all components

Install new seals and bearings in drive units

Cleaning and paining of pumps

Mill cleaning, painting and maintenance
                                                          
Process floor reconstruction and performance coating application

Annual maintenance contract

Coat interior and exterior of water tank

Blast interior of tank

Coat interior of tank with NSF plural component polyurethane liner

Blast exterior of tank

Coat exterior of tank with urethane over epoxy system

Install Containment Lining in Process Floor

Shot blast and scarify damaged concrete substrate

Repair spalled and over finished surface with Epoxy filler

Install cove filler to create flexible joints

Install self-leveling epoxy system to eliminate depressions

Apply chemical resistant top coating

Erect pre-engineered metal building

Remodel Maintenance Shop

Install liner panels around perimeter walls

Install SAT and new lighting

Prep and paint all exposed structure and large equipment

Prep concrete and install floor coating system

Convert old plating room to WWTP

Remove all decommissioned equipment and abandoned piping

Backfill existing sump floor retaining a 12” trench drain

Media blast metal ceiling and structure

Repaint ceiling and walls

Pour new 4000 psi concrete floor

Relocate existing WWTP equipment to new area

Remove spalling and cracking concrete

Sandblast and coat exposed rebar

Install new reinforcing

Cast and gunnite resurface structural members

Industrial Insulation

L.A. Smith & Company and L. A. Smith General Contractors are certified applicator Envirotrol Ceramic Cover CC-Systems 100.

Some Insulation projects include:
• Tanks
• Boilers
• Valves
• Dryers

Abrasive Blasting

L.A. Smith & Company and L.A. Smith General contracting has provided abrasive blasting services for more than 25 years.

Our blast services include structural steel, concrete, tanks, vessels throughout states from Florida to Virginia.

We are trained using all types of blast media to better serve our clients needs.

With a thorough understanding of the environmental impacts of the trade, we adhere to EPA regulations to the fullest extent.

Steel Repair / Painting

Abrasive blasting to clean metal of debris and rust

Remove damaged steel and weld in new steel

Apply coating